Blog

How to Protect Trees During Construction

Posted by Cody Herron / Friday, November 13, 2026 / Posted Under:
featured_image

Trees that look fine at the end of a construction project can decline and die three to five years later. The cause is usually damage below ground, where most of a tree’s roots live in the top 12 to 18 inches of soil and spread well beyond the canopy.

The most common types of damage

  • Soil compaction from equipment, vehicles and stockpiled materials, which crushes the air spaces roots need
  • Cut roots from trenching for utilities, footings and driveways
  • Grade changes, where adding even a few inches of fill can smother roots
  • Trunk and limb wounds from machinery
  • Spills of concrete washout, fuel or chemicals

Protection steps that work

  1. Plan early. Have an arborist map root zones before the design is final.
  2. Fence the protection zone before any equipment arrives, and keep it up until final landscaping.
  3. Keep materials and parking out of fenced areas.
  4. Use mulch or ground protection (such as plywood over wood chips) where access near trees cannot be avoided.
  5. Tunnel or air-excavate instead of trenching near trees, and have roots cut cleanly by an arborist when cutting is unavoidable.
  6. Water during dry months and after construction to help trees recover.

After construction

Watch for thinning canopy, dieback or early fall color in the following seasons, and have an arborist check retained trees if you notice changes. Many permits also require arborist monitoring during construction.

Need help? ABC Herron Tree provides arborist reports, tree risk assessments and permit support in King and Snohomish County. Request a consultation or call 425-293-2443.



Categories


ISA logo ISA logo

Cody Herron / Certified Arborist & Tree Risk Assesor PN 6967A